Build Sub-Mission
Mission 1B · Mission Detail / Pilot Decision Support
Make each Mission page quickly show what the Mission is trying to achieve, what changed, what evidence matters, and whether the Pilot needs to make a judgment call.
Progress
Pilot Decision Brief, Pilot Channel, progressive-disclosure Mission detail, Mission Navigator V0, cumulative Pilot Tasks, Mission Operating Loop V0, deny-by-default Navigator checkpoints, Authority and Attention Cost gates, and operational-change scanning are live and production-verified. What changed excludes Pilot observations from operational summaries while preserving them in Mission history; Signal attention remains independently governed.
Current Gate
Observe Mission Detail during real Mission movement and verify that the Pilot can understand state, change, evidence, authority, and next action without stale summaries or unnecessary cockpit noise.
Next authorized action
Keep Mission 1B in operational observation. Reopen build work only when real use exposes a concrete decision-support, authority, freshness, or attention-cost gap.
Pilot authority
No Pilot approval currently required. Work remains inside the authorized envelope.
Authorized scope
What this aircraft is carrying
Governance
Independent flight, visible dependencies
Evidence Before Expansion applies to this sub-mission independently. A Gate here does not stop another FD Build sub-mission unless a real dependency requires it. Parent Mission 1 remains the cockpit view for the whole build fleet.